Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 12, 2019, 10:33 AM
  • 15 0226_15 0225_06122019_035448.mp4

Date
06/12/2019
W/O
766400
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00627
PipeID
P12148
Time
3:33 AM
Certificate
U-29-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6601
Sewer Name
15 SAN JOSE CREEK TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
02
Purpose
Routine Assessment
Project
WO_766400_TV15133_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0225
Downstream MH
15 0226
Dir. of Survey
Upstream
Length Surveyed
232.7 ft.
Total Length
232.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 15 0225 to 15 0226
MH: 15 0225MH: 15 0226upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 02260.1 ft. MGO - General Observation - NONEXISTING MH1.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish79.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"86.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"209.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"230.3 ft. MGO - General Observation - MAG COAT THROUGHOUT REACH230.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start230.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start232.7 ft. VC - Vermin Cockroach232.7 ft. AMH - Downstream Manhole, Survey Begins - 15 0225232.7 ft. MWL - Water Level, 35 %of cross sectional area232.7 ft. MWM - Water Mark, 45 %of cross sectional area

Observation photos (3)

  • General Observation - MAG COAT THROUGHOUT REACH

    2.4 ft. - General Observation - MAG COAT THROUGHOUT REACH

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0VC
146TF
230.9SSS
0AMH15 0225
153TF
2.4MGOMAG COAT THROUGHOUT REACH
232.7AMH15 0226
23.4TFA
2.4SSS
0MWL
231.2SAP
0MWM
2.4SAP
232.6MGONONEXISTING MH

Properties (6)

additional_info
SC377529
custom_field_two
3
customer
LACSD
datetime
2019-06-12T03:33:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false