Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2019, 03:00 PM
  • 15 0225_15 0224_06102019_021126.mp4

Date
04/26/2019
W/O
766400
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00627
PipeID
P12147
Time
8:00 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6604
Sewer Name
15 SAN JOSE CREEK TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_766400_TV15133_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
15 0225
Downstream MH
15 0224
Dir. of Survey
Downstream
Length Surveyed
169.3 ft.
Total Length
169.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 15 0225 to 15 0224
MH: 15 0225MH: 15 0224downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02250 ft. MWL - Water Level, 25 %of cross sectional area0 ft. VC - Vermin Cockroach2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAG COATING THROUGHOUT REACH2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start165.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish165.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish169.2 ft. MGO - General Observation - CONNECTION AT MH O CLOCK169.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK ABANDONED169.3 ft. AMH - Downstream Manhole, Survey Ends - 15 0224

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT REACH

    2.4 ft. - General Observation - MAG COATING THROUGHOUT REACH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWM
0AMH15 0225
2.4SAP
2.4MGOMAG COATING THROUGHOUT REACH
169.2MGOCONNECTION AT MH O CLOCK
169.3MGOCONNECTION AT MH 3 O'CLOCK ABANDONED
165.9SAP
169.3AMH15 0224
0MWL
0VC
165.9DAGS
2.4DAGS

Properties (6)

additional_info
SC377526
custom_field_two
3
customer
LACSD
datetime
2019-04-26T08:00:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false