15 0235_15 0234_06102019_233038.mp4
1.5 ft. - General Observation - MAG COAT THROUGHOUT REACH
1.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
1.5 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
1.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
150.7 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 07 to 11 o'clock, , within 8 inches of joint: YES - MINERALS
150.7 ft. - Infiltration Dripper, from 10 to 11 o'clock, within 8 inches of joint: YES
234.2 ft. - Infiltration Dripper, from 11 to 01 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 0 | AMH | 15 0235 |
| 1.5 | MGO | MAG COAT THROUGHOUT REACH |
| 621.2 | AMH | 15 0234 |
| 0 | MWM | — |
| 1.5 | SSS | — |
| 150.7 | DSC | MINERALS |
| 1.5 | DAGS | — |
| 0 | VC | — |
| 234.1 | TFC | — |
| 1.5 | SAP | — |
| 617.4 | SSS | — |
| 150.7 | ID | — |
| 234.2 | ID | — |
| 617.4 | SAP | — |
| 617.4 | DAGS | — |