Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2019, 03:00 PM
  • 15 0234_15 0233_06112019_031008.mp4

Date
04/26/2019
W/O
766400
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00627
PipeID
P12156
Time
8:00 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6603
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Purpose
Routine Assessment
Project
WO_766400_TV15133_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
15 0233
Downstream MH
15 0234
Dir. of Survey
Upstream
Length Surveyed
668.9 ft.
Total Length
668.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 15 0233 to 15 0234
MH: 15 0233MH: 15 0234upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 02345.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish5.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish296.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4"300.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"449.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 4"662 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start662 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start662 ft. MGO - General Observation - MAG COAT THROUGHOUT REACH662 ft. VC - Vermin Cockroach668.9 ft. MWL - Water Level, 35 %of cross sectional area668.9 ft. MWM - Water Mark, 40 %of cross sectional area668.9 ft. AMH - Downstream Manhole, Survey Begins - 15 0233

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWL
6.9SAP
6.9SSS
368.2TBA
663.5SSS
0MWM
219.2TFC
0AMH15 0233
668.9AMH15 0234
663.7SAP
6.9MGOMAG COAT THROUGHOUT REACH
6.9VC
372.4TF

Properties (6)

additional_info
SC377527
custom_field_two
3
customer
LACSD
datetime
2019-04-26T08:00:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false