Section#2_02 2080_02 2079__822019__I0203.mp4
2 ft. - General Observation - 100% MAG COAT START
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - ROUGH TEXTURED CONCRETE UNDER MAG COAT
19.2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
29.1 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - R0CKS SLUDGE
59.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - SLIGHTLY ROUGH TEXTURED CONCRETE
63.1 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - SLIGHTLY ROUGH TEXTURED CONCRETE
134.3 ft. - General Observation - 98% MAG COAR START
233.9 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - SLIGHT ROUGH TEXTURED CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 48.7 | DSZ | ROCKS SLUDGE |
| 2 | MGO | 100% MAG COAT START |
| 0 | AMH | 3:25AM |
| 63.1 | SSS | SLIGHTLY ROUGH TEXTURED CONCRETE |
| 0 | MGO | MH CONN 3:00 ACTIVE |
| 134.3 | MGO | 98% MAG COAR START |
| 63.1 | MGO | MAG COAT 95% |
| 19.2 | SSS | PEELING CONCRETE |
| 0 | MWM | — |
| 233.9 | SSS | SLIGHT ROUGH TEXTURED CONCRETE |
| 29.1 | DSZ | R0CKS SLUDGE |
| 59.2 | SSS | SLIGHTLY ROUGH TEXTURED CONCRETE |
| 460 | MGO | MAG COAT 98% FINISH |
| 0 | MWL | — |
| 460 | SSS | SLIGHTLY ROUGH TEXTURED CONCRETE |
| 2 | SSS | ROUGH TEXTURED CONCRETE UNDER MAG COAT |
| 461 | AMH | 4:10AM |