Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 23, 2018, 08:57 AM
  • 18 0105_18 0104 _23072018_020825.mpg

Date
07/23/2018
W/O
716712
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00698
PipeID
P13925
Time
1:57 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5320
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_716712_TV18177_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0105
Downstream MH
18 0104
Dir. of Survey
Downstream
Length Surveyed
170.1 ft.
Total Length
170.1 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
102
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
106
Pipe schematic from manhole 18 0105 to 18 0104
MH: 18 0105MH: 18 0104downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 18 01053.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"35.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"37.6 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"58 ft. CM - Crack Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES65.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"68.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"117.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"120.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"167.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish170.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK170.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK170.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0104

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES

    58 ft. - Crack Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
117.6TFC
35.2TFA
0MWL
120.9TFC
3.1SAP
65.4TFC
170.1MGOCONNECTION AT MH 3 O'CLOCK
0MWM
167.9SAP
37.6TBA
0MGOCONNECTION AT MH 9 O'CLOCK
170.1MGOCONNECTION AT MH 9 O'CLOCK
58CM
68.5TFA
170.1AMH18 0104
19.7TFC
0AMH18 0105

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2018-07-23T01:57:18-07:00
documentation
PROPIPE
is_lateral_inspection
false