Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 23, 2018, 09:54 AM
  • 18 0102_18 0101 _23072018_040644.mpg

Date
07/23/2018
W/O
716712
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00698
PipeID
P13922
Time
2:54 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5320
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_716712_TV18177_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0102
Downstream MH
18 0101
Dir. of Survey
Downstream
Length Surveyed
227.6 ft.
Total Length
227.6 ft.
Structural Index
3
Structural Quick
413H
Structural Rating
139
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
139
Pipe schematic from manhole 18 0102 to 18 0101
MH: 18 0102MH: 18 0101downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 01020 ft. MWM - Water Mark, 40 %of cross sectional area2.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start57.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"60.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"74.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES99.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES109.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"112.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"161.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"164.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"209.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"212.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"223.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish227.6 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK227.6 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK227.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0101

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    99.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (20)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
112.8TFC
223.8SAP
0MGOCONNECTION AT MH 3 O'CLOCK
74.6CM
209.8TFC
0MWL
109.8TFC
0AMH18 0102
0MWM
164.4TFC
227.6MGOCONNECTION AT MH 9 O'CLOCK
227.6MGOCONNECTION AT MH 3 O'CLOCK
212.9TFC
2.7SAP
161.2TFC
60.5TFC
227.6AMH18 0101
57.3TFC
99.4FM

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2018-07-23T02:54:25-07:00
documentation
PROPIPE
is_lateral_inspection
false