18 0425_18 0076 _24072018_021146.mpg
3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
7 ft. - Surface Aggregate Missing, from 11 to 01 o'clock, within 8 inches of joint: YES
12.1 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
34.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES
61.5 ft. - Infiltration Dripper, from 11 to 01 o'clock, within 8 inches of joint: YES
82.8 ft. - Roots Fine Joint, from 07 to 11 o'clock, within 8 inches of joint: YES
111.7 ft. - Roots Fine Joint, from 07 to 12 o'clock, within 8 inches of joint: YES
154.3 ft. - Roots Fine Joint, from 12 to 04 o'clock, within 8 inches of joint: YES
175.7 ft. - Roots Fine Joint, from 07 to 10 o'clock, within 8 inches of joint: YES
190.8 ft. - Roots Fine Joint, from 07 to 11 o'clock, within 8 inches of joint: YES
203.2 ft. - Roots Fine Joint, from 08 to 11 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 154.3 | RFJ | — |
| 222.5 | AMH | 18 0076 |
| 190.8 | RFJ | — |
| 12.1 | SAM | — |
| 111.7 | RFJ | — |
| 3 | SAP | — |
| 157.8 | TFA | — |
| 203.2 | RFJ | — |
| 34.7 | DAE | — |
| 0 | AMH | 18 0425 |
| 175.7 | RFJ | — |
| 61.5 | ID | — |
| 7 | SAM | — |
| 146.7 | DAE | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 221.4 | SAM | — |
| 12.1 | SAP | — |
| 82.8 | RFJ | — |