Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 29, 2017, 08:34 AM
Date
11/29/2017
W/O
673962
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00042
PipeID
P10266
Time
12:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5232
Sewer Name
F JOINT OUTFALL F - UNIT 6
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
34
Purpose
Routine Assessment
Project
WO_673962_TV02160_DEC2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
F 0134
Downstream MH
F 0133
Dir. of Survey
Downstream
Length Surveyed
209.7 ft.
Total Length
209.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2G00
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
84
Pipe schematic from manhole F 0134 to F 0133
MH: F 0134MH: F 0133downstream0 ft. AMH - Upstream Manhole, Survey Begins - F 01340 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start47.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"109.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"209.7 ft. AMH - Downstream Manhole, Survey Ends - F 0133209.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
209.7AMHF 0133
0AMHF 0134
47.1TF
2DAGS
209.7DAGS
109.2TF
0MWM
0MWL

Properties (6)

additional_info
SC346403
custom_field_two
4
customer
LACSD
datetime
2017-11-29T00:34:35-08:00
documentation
PRO PIPE
is_lateral_inspection
false