Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 9, 2019, 08:24 AM
  • Section#11_G 0153_G 0152__892019__G0211.mp4

Date
08/09/2019
W/O
0776877
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P01476
Time
1:24 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G0211
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Capital Improvement Program Assesment
Project
20190807MDM_JOINT_OUTFALL_G_UNIT_8
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
G 0153
Downstream MH
G 0152
Dir. of Survey
Downstream
Length Surveyed
358.9 ft.
Total Length
358.9 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
123
O&M Index
3
O&M Quick
4222
O&M Rating
12
Overall Index
3
Overall Quick
Overall Rating
135
Pipe schematic from manhole G 0153 to G 0152
MH: G 0153MH: G 0152downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:50AM1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: NO - INSIDE MH2 ft. MGO - General Observation - 70% MAG & GREASE COAT START2 ft. MGO - General Observation - 100% TILES IN PLACE UNDER MAG & GREASE COAT5.4 ft. MWM - Water Mark, 60 %of cross sectional area8 ft. MGP - General Photograph - MAG & GREASE COAT10 ft. MGO - General Observation - MAG & GREASE COAT 80% START13 ft. MGO - General Observation - POSSIBLE MISSING TILE UNDER MAG COAT18.9 ft. MGO - General Observation - PARTIAL MISSING TILE29.9 ft. MGO - General Observation - MISSING TILE 12:0029.9 ft. MGO - General Observation - 99% TILES IN PLACE START53.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE78 ft. MGO - General Observation - 1 MISSING TILE 12:0099.5 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: NO - HANGING DEBRIE99.5 ft. MGO - General Observation - 95% MAG & GREASE COAT START110.6 ft. MGO - General Observation - 1 MISSING TILE 10:00118.3 ft. MGO - General Observation - 1 MISSING TILE 9:00121.5 ft. MGO - General Observation - 2 MISSING TILES 12:00125.6 ft. MGO - General Observation - 5% MISSING TILES START UNDER MAG GREASE COAT125.6 ft. MWM - Water Mark, 50 %of cross sectional area150.5 ft. SAP - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG AREA OF MISSING TILES150.5 ft. MGO - General Observation - MISSING TILES 100% UNDER MAG GREASE COAT START154.8 ft. MGO - General Observation - 100% MISSING TILES FINISH159.8 ft. MGO - General Observation - MISSING TILES 80% START UNDER MAG GREASE COAT159.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES212.8 ft. MGO - General Observation - 20% MISSING TILES START271.5 ft. MGO - General Observation - 50% MISSING TILES 9:00 TO 3:00358 ft. MGO - General Observation - 20% MISSING TILES FINISH UNDER MAG GREASE COAT358 ft. MGO - General Observation - MH CONN 9:00 STUB358 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG AREAS OF MISSING TILES358 ft. MGO - General Observation - MH CONN 3:00 ACTIVE358.9 ft. AMH - Downstream Manhole, Survey Ends - 2:40AM

Observation photos (15)

  • General Observation - 70% MAG & GREASE COAT START

    2 ft. - General Observation - 70% MAG & GREASE COAT START

  • General Observation - 100% TILES IN PLACE UNDER MAG & GREASE COAT

    2 ft. - General Observation - 100% TILES IN PLACE UNDER MAG & GREASE COAT

  • General Photograph - MAG & GREASE COAT

    8 ft. - General Photograph - MAG & GREASE COAT

  • General Observation - MAG & GREASE COAT 80% START

    10 ft. - General Observation - MAG & GREASE COAT 80% START

  • General Observation - POSSIBLE MISSING TILE UNDER MAG COAT

    13 ft. - General Observation - POSSIBLE MISSING TILE UNDER MAG COAT

  • General Observation - PARTIAL MISSING TILE

    18.9 ft. - General Observation - PARTIAL MISSING TILE

  • General Observation - MISSING TILE 12:00

    29.9 ft. - General Observation - MISSING TILE 12:00

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 11 o'clock,  , within 8 inches of joint: NO - HANGING DEBRIE

    99.5 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: NO - HANGING DEBRIE

  • General Observation - 95% MAG & GREASE COAT START

    99.5 ft. - General Observation - 95% MAG & GREASE COAT START

  • General Observation - 5% MISSING TILES START UNDER MAG GREASE COAT

    125.6 ft. - General Observation - 5% MISSING TILES START UNDER MAG GREASE COAT

  • Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG AREA OF MISSING TILES

    150.5 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG AREA OF MISSING TILES

  • General Observation - MISSING TILES 100% UNDER MAG GREASE COAT START

    150.5 ft. - General Observation - MISSING TILES 100% UNDER MAG GREASE COAT START

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

    159.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

  • General Observation - 20% MISSING TILES START

    212.8 ft. - General Observation - 20% MISSING TILES START

  • General Observation - 50% MISSING TILES 9:00 TO 3:00

    271.5 ft. - General Observation - 50% MISSING TILES 9:00 TO 3:00

Observations (35)

DistanceCodeObservation
1DAGSINSIDE MH
13MGOPOSSIBLE MISSING TILE UNDER MAG COAT
2MGO70% MAG & GREASE COAT START
358MGO20% MISSING TILES FINISH UNDER MAG GREASE COAT
271.5MGO50% MISSING TILES 9:00 TO 3:00
358MGOMH CONN 9:00 STUB
150.5SAPSEVERE AGG AREA OF MISSING TILES
99.5DAZHANGING DEBRIE
10MGOMAG & GREASE COAT 80% START
110.6MGO1 MISSING TILE 10:00
99.5MGO95% MAG & GREASE COAT START
0MWM
8MGPMAG & GREASE COAT
154.8MGO100% MISSING TILES FINISH
53.5TFACTIVE
358.9AMH2:40AM
18.9MGOPARTIAL MISSING TILE
159.8MGOMISSING TILES 80% START UNDER MAG GREASE COAT
159.8SAPSEVERE AGG AREAS OF MISSING TILES
125.6MGO5% MISSING TILES START UNDER MAG GREASE COAT
0MGOMH CONN 9:00 ACTIVE
358SAPSEVERE AGG AREAS OF MISSING TILES
78MGO1 MISSING TILE 12:00
358MGOMH CONN 3:00 ACTIVE
0MWL
0AMH1:50AM
118.3MGO1 MISSING TILE 9:00
29.9MGOMISSING TILE 12:00
125.6MWM
121.5MGO2 MISSING TILES 12:00
5.4MWM
29.9MGO99% TILES IN PLACE START
2MGO100% TILES IN PLACE UNDER MAG & GREASE COAT
212.8MGO20% MISSING TILES START
150.5MGOMISSING TILES 100% UNDER MAG GREASE COAT START

Properties (6)

custom_field_three
SEVERE AGG PROJECTING AREAS OF MISSING TILES
custom_field_two
2
customer
LACSD
datetime
2019-08-09T01:24:32-07:00
documentation
MARTIN,REVELES,OLIVER 111,BRAR
is_lateral_inspection
false