Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2019, 06:29 AM
  • 18 0451_18 0450 _06132019_234906.mp4

Date
06/13/2019
W/O
766512
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00675
PipeID
P14302
Time
11:29 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6599
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
WO_766512_TV18097_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0450
Downstream MH
18 0451
Dir. of Survey
Upstream
Length Surveyed
321.6 ft.
Total Length
321.6 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
2
O&M Quick
2X11
O&M Rating
253
Overall Index
2
Overall Quick
Overall Rating
260
Pipe schematic from manhole 18 0450 to 18 0451
MH: 18 0450MH: 18 0451upstream0 ft. AMH - Upstream Manhole, Survey Ends - 18 04510 ft. MGO - General Observation - SERVICE CONNECTION AT 12 O'CLOCK AT MH ACTIVE2.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish31.7 ft. CM - Crack Multiple, from 03 to 06 o'clock, within 8 inches of joint: YES - POSSIBLE BROKEN PIPE58.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"85.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"110.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"131.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"157.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"183.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"208.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"213.1 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES234.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"260.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"285.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"307.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"310.9 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES319.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start319.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start319.6 ft. MMC - Material Change, Vitrified clay pipe321.6 ft. MWL - Water Level, 10 %of cross sectional area321.6 ft. AMH - Downstream Manhole, Survey Begins - 18 0450321.6 ft. MWM - Water Mark, 30 %of cross sectional area321.6 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH CAPPED321.6 ft. VC - Vermin Cockroach

Observation photos (5)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    10.7 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    108.5 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 03 to 06 o'clock, within 8 inches of joint: YES - POSSIBLE BROKEN PIPE

    289.9 ft. - Crack Multiple, from 03 to 06 o'clock, within 8 inches of joint: YES - POSSIBLE BROKEN PIPE

Observations (26)

DistanceCodeObservation
86.8TFC
10.7CL
321.6AMH18 0451
289.9CMPOSSIBLE BROKEN PIPE
2DAE
0MWL
112.9TFC
138.3TFC
164.3TFC
2DAGS
108.5CL
190.4TFC
0AMH18 0450
236.1TFC
2MMC
0MWM
319.4DAE
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH CAPPED
60.9TFC
35.8TFC
210.8TFC
262.7TFC
321.6MGOSERVICE CONNECTION AT 12 O'CLOCK AT MH ACTIVE
0VC
319.4DAGS
14.5TFC

Properties (6)

additional_info
SC377531
custom_field_two
2
customer
LACSD
datetime
2019-06-13T23:29:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false