Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2019, 10:35 AM
  • 18 0429_18 0428 _06142019_040010.mp4

Date
06/14/2019
W/O
766512
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00675
PipeID
P14277
Time
3:35 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6599
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
WO_766512_TV18097_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0429
Downstream MH
18 0428
Dir. of Survey
Downstream
Length Surveyed
326.4 ft.
Total Length
326.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
3122
O&M Rating
7
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 18 0429 to 18 0428
MH: 18 0429MH: 18 0428downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. VR - Vermin - Rat, within 8 inches of joint: NO, 4 - MULTIPLE RATS0 ft. AMH - Upstream Manhole, Survey Begins - 18 04292.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2.7 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH2.7 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.7 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start246.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"299.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"313.7 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS326.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIS326.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish326.4 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish326.4 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish326.4 ft. MSA - Survey Abandoned - DEBRIS

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

    2.7 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
326.4DSZDEBRIS
313.7DSZDEBRIS
326.4DAGS
2.7DAGS
0MWM
326.4SSS
326.4SAP
2.7MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
0MWL
2.7SSS
246.1TFC
326.4MSADEBRIS
0VRMULTIPLE RATS
299.1TFC
0AMH18 0429
2.7SAP

Properties (6)

additional_info
SC377531
custom_field_two
5
customer
LACSD
datetime
2019-06-14T03:35:31-07:00
documentation
PRO PIPE
is_lateral_inspection
false