Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2019, 09:32 AM
  • 18 0432_18 0431 _06142019_025700.mp4

Date
06/14/2019
W/O
766512
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00675
PipeID
P14280
Time
2:32 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6599
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
WO_766512_TV18097_MAY2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0431
Downstream MH
18 0432
Dir. of Survey
Upstream
Length Surveyed
454.7 ft.
Total Length
454.7 ft.
Structural Index
3
Structural Quick
523Q
Structural Rating
460
O&M Index
2
O&M Quick
2411
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
469
Pipe schematic from manhole 18 0431 to 18 0432
MH: 18 0431MH: 18 0432upstream0 ft. AMH - Upstream Manhole, Survey Ends - 18 04322.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish2.8 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish2.8 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish3.7 ft. SRV - Surface Reinforcement Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish6.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"10.7 ft. SRV - Surface Reinforcement Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start26 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4"54.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"78.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"78.7 ft. VR - Vermin - Rat, within 8 inches of joint: YES, 1 - INSIDE THE CONNECTION @ 10 O'CLOCK102.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"127 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"151.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"179.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"203.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"227.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"250.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"284 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"332 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"345.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS380.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"432.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"452.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start452.3 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH452.3 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start452.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start454.7 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH ACTIVE454.7 ft. VC - Vermin Cockroach454.7 ft. MWM - Water Mark, 25 %of cross sectional area454.7 ft. MWL - Water Level, 10 %of cross sectional area454.7 ft. AMH - Downstream Manhole, Survey Begins - 18 0431

Observation photos (5)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

    2.4 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT REACH

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIS

    109.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS

Observations (32)

DistanceCodeObservation
251.6TBA
448.6TFA
2.4SAP
451.9DAGS
22.6TFC
444SRV
303.4TFC
2.4MGOMAGNEZIUM H.O COATING THROUGHOUT REACH
428.7TB
122.7TF
376.6TFC
275.5TFC
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH ACTIVE
0VC
0MWM
0MWL
454.7AMH18 0432
109.2DSZDEBRIS
400.3TFC
327.7TFC
352.6TFC
2.4SSS
451.9SSS
376VRINSIDE THE CONNECTION @ 10 O'CLOCK
451SRV
451.9SAP
204.1TFC
170.7TFC
2.4DAGS
0AMH18 0431
74.6TFC
227.2TF

Properties (5)

additional_info
SC377531
customer
LACSD
datetime
2019-06-14T02:32:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false