Section#2_E 0122_E 0121__8122019__I0213.mp4
1.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
5.6 ft. - General Observation - MAG COAT 90% START
25.6 ft. - General Photograph - MAG COAT
49.8 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
51.3 ft. - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG
63.8 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
66.9 ft. - Surface Aggregate Visible, from 01 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
85.5 ft. - General Observation - 98% MAG COAT START
105.6 ft. - Surface Spalling, from 12 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
156.9 ft. - Surface Spalling, from 10 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
159.4 ft. - Surface Aggregate Visible, from 11 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
266.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT
365.5 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG
429 ft. - General Observation - 100% MAG COAT
454.6 ft. - Surface Spalling, from 01 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
456.4 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
| Distance | Code | Observation |
|---|---|---|
| 758.2 | MGO | 98% MAG COAT FINISH |
| 758.2 | SSS | BLISTERING PEELING CONCRETE |
| 454.6 | SSS | PEELING CONCRETE |
| 266.7 | SSS | BLISTERING CONCRETE UNDER MAG COAT |
| 533.4 | SSS | PEELING CONCRETE |
| 429 | MGO | 100% MAG COAT |
| 49.8 | SSS | PEELING CONCRETE |
| 0 | AMH | 3:20AM |
| 63.8 | SSS | PEELING CONCRETE |
| 758.7 | AMH | 4:10AM |
| 51.3 | SAV | SEVERE AGG |
| 105.6 | SSS | PEELING CONCRETE |
| 0 | MWM | — |
| 66.9 | SAV | SEVERE AGG SPORATIC |
| 85.5 | MGO | 98% MAG COAT START |
| 456.4 | SAV | SEVERE AGG SPORATIC |
| 0 | MWL | — |
| 159.4 | SAV | SEVERE AGG |
| 365.5 | SAV | SEVERE AGG |
| 5.6 | MGO | MAG COAT 90% START |
| 1.9 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 156.9 | SSS | PEELING CONCRETE |
| 25.6 | MGP | MAG COAT |