05 0469_05 0468_892019_120244.mp4
0 ft. - Downstream Manhole, Survey Begins - 11:43 AM
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
99.5 ft. - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: YES, 4" - Open
100.8 ft. - General Photograph
151.8 ft. - Crack Spiral, from 06 to 10 o'clock, within 8 inches of joint: YES
212.7 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open
212.7 ft. - General Photograph
214.7 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open/40% GREASE-LATERAL
| Distance | Code | Observation |
|---|---|---|
| 151.8 | CS | — |
| 163.7 | TF | Open |
| 0 | AMH | 11:43 AM |
| 18.6 | TFA | — |
| 0.1 | MWM | — |
| 2 | SSS | — |
| 100.8 | MGP | — |
| 212.7 | TFD | Open |
| 290.9 | MGO | ROACHES @ MH |
| 287.5 | CM | — |
| 2 | CM | — |
| 290.9 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 290.9 | AMH | 12:34 PM |
| 212.7 | MGP | — |
| 214.7 | TFD | Open/40% GREASE-LATERAL |
| 0.1 | MWL | — |
| 99.5 | TBD | Open |
| 148 | TF | Open |
| 91.7 | TFC | — |
| 112.3 | TF | Open |
| 61.3 | TF | Open |
| 2 | MGO | ROACHES @ MH |
| 290.9 | MGO | Conn. @ Mh, 9 O' Clock. CAPPED |
| 287.5 | SSS | — |
| 176.5 | TF | Open |
| 9.6 | TF | Open |