Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 9, 2019, 06:41 PM
  • 05 0469_05 0468_892019_120244.mp4

Date
08/09/2019
W/O
0786503
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00526
PipeID
P05684
Time
11:41 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8051
Sewer Name
05 STRAWBERRY AVENUE TRUNK
City
HAWTHORNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
20190809DF_STRAWBERRY_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
05 0468
Downstream MH
05 0469
Dir. of Survey
Upstream
Length Surveyed
290.9 ft.
Total Length
290.9 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
2
O&M Quick
3122
O&M Rating
7
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 05 0468 to 05 0469
MH: 05 0468MH: 05 0469upstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. AMH - Upstream Manhole, Survey Ends - 12:34 PM0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. CAPPED3.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish76.2 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open/40% GREASE-LATERAL78.2 ft. TFD - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open78.2 ft. MGP - General Photograph114.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open127.2 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open139.1 ft. CS - Crack Spiral, from 06 to 10 o'clock, within 8 inches of joint: YES142.9 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open178.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open190.1 ft. MGP - General Photograph191.4 ft. TBD - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: YES, 4" - Open199.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"229.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open272.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"281.3 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open288.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start288.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start288.9 ft. MGO - General Observation - ROACHES @ MH290.8 ft. MWM - Water Mark, 20 %of cross sectional area290.8 ft. MWL - Water Level, 15 %of cross sectional area290.9 ft. AMH - Downstream Manhole, Survey Begins - 11:43 AM

Observation photos (9)

  • Downstream Manhole, Survey Begins - 11:43 AM

    0 ft. - Downstream Manhole, Survey Begins - 11:43 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Defective, at 10 o'clock, -,  , within 8 inches of joint: YES, 4" - Open

    99.5 ft. - Tap Break-In Defective, at 10 o'clock, -, , within 8 inches of joint: YES, 4" - Open

  • General Photograph

    100.8 ft. - General Photograph

  • Crack Spiral, from 06 to 10 o'clock, within 8 inches of joint: YES

    151.8 ft. - Crack Spiral, from 06 to 10 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open

    212.7 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open

  • General Photograph

    212.7 ft. - General Photograph

  • Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open/40% GREASE-LATERAL

    214.7 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open/40% GREASE-LATERAL

Observations (26)

DistanceCodeObservation
151.8CS
163.7TFOpen
0AMH11:43 AM
18.6TFA
0.1MWM
2SSS
100.8MGP
212.7TFDOpen
290.9MGOROACHES @ MH
287.5CM
2CM
290.9MGOConn. @ Mh, 3 O' Clock. OPEN
290.9AMH12:34 PM
212.7MGP
214.7TFDOpen/40% GREASE-LATERAL
0.1MWL
99.5TBDOpen
148TFOpen
91.7TFC
112.3TFOpen
61.3TFOpen
2MGOROACHES @ MH
290.9MGOConn. @ Mh, 9 O' Clock. CAPPED
287.5SSS
176.5TFOpen
9.6TFOpen

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-09T11:41:05-07:00
documentation
FRANKLIN, CASTILLO, RUVALCABA
is_lateral_inspection
false