C 0309_C 0308 _06182019_024000.mp4
4.5 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
4.5 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
5.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
5.3 ft. - Infiltration Dripper, at 03 o'clock, within 8 inches of joint: YES
11 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
19.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
21.9 ft. - Infiltration Dripper, at 03 o'clock, within 8 inches of joint: YES
37.2 ft. - Infiltration Runner, from 01 to 02 o'clock, within 8 inches of joint: YES
78.6 ft. - Infiltration Gusher, at 12 o'clock, within 8 inches of joint: YES
210 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 331.5 | TBA | — |
| 0 | AMH | C 0309 |
| 4.5 | SAP | — |
| 377.2 | DSC | — |
| 5.3 | DAE | — |
| 5.3 | ID | — |
| 0 | MWL | — |
| 4.5 | DAGS | — |
| 78.6 | IG | — |
| 210 | SAP | — |
| 37.2 | IR | — |
| 19.6 | DAGS | — |
| 226.7 | TBA | — |
| 121.2 | TFA | — |
| 95 | SRV | — |
| 425.2 | DAGS | — |
| 427.8 | AMH | C 0308 |
| 425.2 | DAE | — |
| 19.6 | DAGS | — |
| 11 | SRV | — |
| 21.9 | ID | — |
| 0 | MGO | ACTIVE CONNECTIONS AT BOTH 3 AND 9 O' CLOCK AT MH |
| 425.2 | SSS | — |
| 0 | MWM | — |
| 425.2 | DSC | — |
| 210 | SSS | — |