H 0405_A 0300_7312019_095411.mp4
0.1 ft. - Water Mark, 30 %of cross sectional area
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
95.1 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Unkown
225.2 ft. - General Photograph
261.6 ft. - General Photograph
261.6 ft. - General Photograph
263.4 ft. - Hole Void Visible, from 08 to 10 o'clock, within 8 inches of joint: YES, Start
266.6 ft. - General Photograph
414.1 ft. - General Photograph
613 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 2 | SRV | — |
| 616 | MGO | Peeling & Flaking Throughout The Reach |
| 612.7 | SAP | — |
| 616 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 263.4 | HVV | — |
| 2 | SZ | 60% MAG |
| 0 | AMH | 9:20 AM |
| 612.7 | SRV | — |
| 414.1 | MGP | — |
| 0.1 | MWL | — |
| 613 | MGP | — |
| 261.6 | MGP | — |
| 613 | SZ | 60% MAG |
| 0.1 | MWM | — |
| 269.3 | HVV | — |
| 2 | SAP | — |
| 266.6 | MGP | — |
| 95.1 | TF | Unkown |
| 261.6 | MGP | — |
| 612.7 | SAV | — |
| 225.2 | MGP | — |
| 612.7 | SSS | — |
| 616 | AMH | 10:52 AM |
| 2 | SAV | — |
| 2 | SSS | — |