Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2019, 08:39 AM
  • 25_1_1_17052019_020043.mp4

Date
05/16/2019
W/O
761817
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18064
Time
1:39 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6530
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
WO_761817_TV14018_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0052
Downstream MH
14 0051
Dir. of Survey
Downstream
Length Surveyed
387.6 ft.
Total Length
387.6 ft.
Structural Index
5
Structural Quick
5N32
Structural Rating
375
O&M Index
3
O&M Quick
5132
O&M Rating
15
Overall Index
5
Overall Quick
Overall Rating
390
Pipe schematic from manhole 14 0052 to 14 0051
MH: 14 0052MH: 14 0051downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 00520 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 80 %of cross sectional area2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start20.2 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS UNDER WATER20.2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start80.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"206.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"247.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"387.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish387.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish387.6 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish387.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0051387.6 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish387.6 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    20.2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
20.2DSZDEBRIS UNDER WATER
80.4TFC
387.6DSZ
206.8TBA
2SSS
0AMH14 0052
0MWL
387.6DAGS
247.6TFC
387.6SSS
2DAGS
20.2SRV
387.6AMH14 0051
387.6SRV
2SAP
387.6SAP
0MWM

Properties (6)

additional_info
SC366250
custom_field_two
2
customer
LACSD
datetime
2019-05-16T01:39:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false