Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 20, 2019, 09:54 AM
  • 23_1_1_20052019_030636.mp4

Date
05/20/2019
W/O
761817
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18062
Time
2:54 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6531
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
WO_761817_TV14018_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0050
Downstream MH
14 0049
Dir. of Survey
Downstream
Length Surveyed
453.4 ft.
Total Length
453.4 ft.
Structural Index
3
Structural Quick
5N3Q
Structural Rating
815
O&M Index
2
O&M Quick
412Q
O&M Rating
184
Overall Index
3
Overall Quick
Overall Rating
999
Pipe schematic from manhole 14 0050 to 14 0049
MH: 14 0050MH: 14 0049downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00502 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start85.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start153.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"232.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"279.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"327.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"384.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"450.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish450.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish450.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish450.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish453.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0049

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    85.7 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2SAP
450.7SRV
0MWM
279.9TFC
450.7SSS
232.2TFC
0MWL
327.9TFC
0AMH14 0050
450.7DAGS
453.4AMH14 0049
450.7SAP
2SSS
153.4TFC
85.7SRV
2DAGS
384.5TFC

Properties (6)

additional_info
SC377668
custom_field_two
2
customer
LACSD
datetime
2019-05-20T02:54:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false