Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 16, 2019, 05:30 AM
  • 3_1_1_15042019_235244.mp4

Date
04/15/2019
W/O
761426
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00141
PipeID
P09834
Time
10:30 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6519
Sewer Name
C JOINT OUTFALL C - UNIT 8C
City
HAWAIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
WO_761426_TV19012_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
C 0371
Downstream MH
C 0370
Dir. of Survey
Downstream
Length Surveyed
619.4 ft.
Total Length
619.4 ft.
Structural Index
3
Structural Quick
3W2X
Structural Rating
609
O&M Index
2
O&M Quick
5242
O&M Rating
276
Overall Index
2
Overall Quick
Overall Rating
885
Pipe schematic from manhole C 0371 to C 0370
MH: C 0371MH: C 0370downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - C 03712 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10 ft. MGO - General Observation - MAG COAT THROUGHOUT START10 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75.3 ft. IS - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES196.2 ft. IS - Infiltration Stain, at 10 o'clock, within 8 inches of joint: YES246.4 ft. IS - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES254.3 ft. IG - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES349 ft. ID - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES349 ft. IS - Infiltration Stain, at 11 o'clock, within 8 inches of joint: YES367.1 ft. IS - Infiltration Stain, at 02 o'clock, within 8 inches of joint: YES384.2 ft. IS - Infiltration Stain, at 02 o'clock, within 8 inches of joint: YES415.8 ft. IS - Infiltration Stain, at 02 o'clock, within 8 inches of joint: YES422 ft. IS - Infiltration Stain, at 12 o'clock, within 8 inches of joint: YES446.8 ft. IS - Infiltration Stain, at 12 o'clock, within 8 inches of joint: YES454.8 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES471.4 ft. ID - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES510.9 ft. IG - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES527 ft. ID - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES566.7 ft. IR - Infiltration Runner, from 12 to 03 o'clock, within 8 inches of joint: YES575.3 ft. IR - Infiltration Runner, from 10 to 12 o'clock, within 8 inches of joint: YES615.2 ft. MGO - General Observation - MAG COAT THROUGHOUT END615.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish619.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish619.4 ft. MGO - General Observation - INFILTRATION IN MH619.4 ft. AMH - Downstream Manhole, Survey Ends - C 0370619.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED619.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish

Observation photos (11)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES

    75.3 ft. - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES

    246.4 ft. - Infiltration Stain, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES

    254.3 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

    349 ft. - Infiltration Dripper, at 02 o'clock, within 8 inches of joint: YES

  • Infiltration Stain, at 11 o'clock, within 8 inches of joint: YES

    349 ft. - Infiltration Stain, at 11 o'clock, within 8 inches of joint: YES

  • Infiltration Stain, at 12 o'clock, within 8 inches of joint: YES

    446.8 ft. - Infiltration Stain, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

    471.4 ft. - Infiltration Dripper, at 01 o'clock, within 8 inches of joint: YES

  • Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

    527 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES

  • Infiltration Runner, from 12 to 03 o'clock, within 8 inches of joint: YES

    566.7 ft. - Infiltration Runner, from 12 to 03 o'clock, within 8 inches of joint: YES

  • Infiltration Runner, from 10 to 12 o'clock, within 8 inches of joint: YES

    575.3 ft. - Infiltration Runner, from 10 to 12 o'clock, within 8 inches of joint: YES

Observations (32)

DistanceCodeObservation
619.4DAGS
10MGOMAG COAT THROUGHOUT START
349ID
619.4MGOINFILTRATION IN MH
384.2IS
510.9IG
196.2IS
75.3IS
0MWM
2SSS
619.4AMHC 0370
0MWL
619.4MGOCONNECTION AT MH 9 O'CLOCK CAPPED
10SAP
471.4ID
446.8IS
454.8ID
254.3IG
0MGOCONNECTION AT MH 9 O'CLOCK
415.8IS
566.7IR
575.3IR
246.4IS
615.2MGOMAG COAT THROUGHOUT END
619.4SSS
527ID
349IS
422IS
615.2SAP
0AMHC 0371
367.1IS
2DAGS

Properties (6)

custom_field_two
3
customer
LACSD
datetime
2019-04-15T22:30:34-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
26760