Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2019, 05:05 PM
  • 16 0571_16 0570_7222019_100912.mp4

Date
07/22/2019
W/O
0782150
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00659
PipeID
P13622
Time
10:05 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Jetting
Media Label
G8034
Sewer Name
16 LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
11
Purpose
Maintenance Related
Project
20190722DF_LAMANDA_PARK_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
22 in.
Upstream MH
16 0571
Downstream MH
16 0570
Dir. of Survey
Downstream
Length Surveyed
256.3 ft.
Total Length
256.3 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
18
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
18
Pipe schematic from manhole 16 0571 to 16 0570
MH: 16 0571MH: 16 0570downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:07 AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"34.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open40.7 ft. MGP - General Photograph55.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG95.9 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"111.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"131.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"163.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"183.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"219.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"254 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish254 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 40% MAG254 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish255 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish255 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish255 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish256.3 ft. AMH - Downstream Manhole, Survey Ends - 10:27 AM256.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)

Observation photos (7)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    40.7 ft. - General Photograph

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG

    55.1 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG

Observations (26)

DistanceCodeObservation
254SRC
131.3TFC
254SZ40% MAG
0AMH10:07 AM
256.3AMH10:27 AM
254SRV
111.4TFC
55.1SZ40% MAG
256.3MGOGREASE THROUGHOUT THE REACH (5%)
255SAP
255SSS
0MWM
219.6TFC
2SAP
0MWL
2SRV
163.3TFC
255SAVC
2SRC
10.4TFC
40.7MGP
183.4TFC
95.9TFA
2SAVC
34.8TFOpen
2SSS

Properties (7)

additional_info
ROOT EVALUATION ONLY
custom_field_three
AGGREGATE PROJECTING, REINFORCEMENT CORRODED
custom_field_two
2
customer
LACSD
datetime
2019-07-22T10:05:58-07:00
documentation
FRANKLIN, CASTILLO, RUVALCABA, IGNACIO
is_lateral_inspection
false