Wastewater/Activity/PacpInspection/1.0Mar 23, 2018, 06:20 AM
  • 20 0161_20 0160_23032018_000343.mp4

Date
03/22/2018
W/O
690447
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00745
PipeID
P19084
Time
11:20 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5495
Sewer Name
20 TRUNK "D"
City
PALMDALE
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
06
Purpose
Routine Assessment
Project
WO_690447_TV20029_MAR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0160
Downstream MH
20 0161
Dir. of Survey
Upstream
Length Surveyed
350.3 ft.
Total Length
350.3 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
210
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
210
Pipe schematic from manhole 20 0160 to 20 0161
MH: 20 0160MH: 20 0161upstream0 ft. AMH - Upstream Manhole, Survey Ends - 20 01610 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish52.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"101.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"149 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"199 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"251.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"305.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"327.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"348.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start350.3 ft. MWL - Water Level, 15 %of cross sectional area350.3 ft. MWM - Water Mark, 25 %of cross sectional area350.3 ft. AMH - Downstream Manhole, Survey Begins - 20 0160

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2SAP
0MWL
201.3TFC
297.9TFC
45TFC
350.3AMH20 0161
151.3TFC
350.3SAP
0MWM
249.2TFC
0AMH20 0160
22.4TFC
98.6TFC

Properties (6)

additional_info
SC358503
custom_field_two
2
customer
LACSD
datetime
2018-03-22T23:20:54-07:00
documentation
PRO PIPE
is_lateral_inspection