Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2018, 05:39 AM
  • 22 0622_22 0621 _24052018_224741.mp4

Date
05/24/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16970
Time
10:39 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5710
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0622
Downstream MH
22 0621
Dir. of Survey
Downstream
Length Surveyed
132.7 ft.
Total Length
132.7 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
130
O&M Index
2
O&M Quick
2D00
O&M Rating
52
Overall Index
2
Overall Quick
Overall Rating
182
Pipe schematic from manhole 22 0622 to 22 0621
MH: 22 0622MH: 22 0621downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06220 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"10.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"59.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"75 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"104.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"120.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"131.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish131.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish131.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish132.7 ft. MGO - General Observation - COCKROACHES IN MANHOLE132.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0621

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
0MWL
59.5TFC
132.7MGOCOCKROACHES IN MANHOLE
2SSS
120.4TFC
131.7SAP
0AMH22 0622
132.7AMH22 0621
6.6TFC
0MWM
10.7TFC
75TFC
0MGOCOCKROACHES IN MANHOLE
131.7DAGS
2SAP
2DAGS
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
131.7SSS
104.3TFC

Properties (6)

additional_info
SC359376
custom_field_two
2
customer
LACSD
datetime
2018-05-24T22:39:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false