Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2018, 09:43 AM
  • 22 0627_22 0626 _24052018_024957.mp4

Date
05/24/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16975
Time
2:43 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5709
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0627
Downstream MH
22 0626
Dir. of Survey
Downstream
Length Surveyed
64.5 ft.
Total Length
64.5 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
60
O&M Index
2
O&M Quick
2A00
O&M Rating
24
Overall Index
2
Overall Quick
Overall Rating
84
Pipe schematic from manhole 22 0627 to 22 0626
MH: 22 0627MH: 22 0626downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06272 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"32 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"62.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish62.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish62.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish64.5 ft. AMH - Downstream Manhole, Survey Ends - 22 062664.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK64.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
32TFC
11.3TFC
62.9SSS
2DAGS
2SSS
64.5AMH22 0626
62.9DAGS
64.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWL
62.9SAP
0MGOCOCKROACHES IN MANHOLE
64.5MGOCOCKROACHES IN MANHOLE
0MWM
2SAP
0AMH22 0627

Properties (6)

additional_info
SC359375
custom_field_two
2
customer
LACSD
datetime
2018-05-24T02:43:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false