Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 22, 2018, 09:01 AM
  • 22 0649_22 0648 _22052018_021307.mp4

Date
05/22/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16997
Time
2:01 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5605
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0648
Downstream MH
22 0649
Dir. of Survey
Upstream
Length Surveyed
213.1 ft.
Total Length
213.1 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
210
O&M Index
2
O&M Quick
2G00
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
294
Pipe schematic from manhole 22 0648 to 22 0649
MH: 22 0648MH: 22 0649upstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Ends - 55 06491.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish1.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish54.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"58.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"127.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"201.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"205.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"211.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start211.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start211.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start213.1 ft. AMH - Downstream Manhole, Survey Begins - 22 0648213.1 ft. MWM - Water Mark, 25 %of cross sectional area213.1 ft. MWL - Water Level, 15 %of cross sectional area213.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
85.7TFC
211.7SSS
213.1MGOCOCKROACHES IN MANHOLE
213.1AMH55 0649
0AMH22 0648
8TFC
11.9TFC
2SAP
158.7TFC
0MWM
2DAGS
154.8TFC
0MWL
211.7DAGS
211.7SAP
2SSS
0MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC359371
custom_field_two
2
customer
LACSD
datetime
2018-05-22T02:01:51-07:00
documentation
PRO PIPE
is_lateral_inspection
false