Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2018, 09:44 AM
  • 22 0615A_22 0615 _25052018_025544.mp4

Date
05/25/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16963
Time
2:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5710
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0615
Downstream MH
22 0615A
Dir. of Survey
Upstream
Length Surveyed
160.7 ft.
Total Length
160.7 ft.
Structural Index
3
Structural Quick
3E00
Structural Rating
93
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
3
Overall Quick
Overall Rating
155
Pipe schematic from manhole 22 0615 to 22 0615A
MH: 22 0615MH: 22 0615Aupstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Ends - 22 0615A1.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish46 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"66.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"90.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"123.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"135.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"158.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start158.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start160.7 ft. AMH - Downstream Manhole, Survey Begins - 22 0615160.7 ft. MWM - Water Mark, 35 %of cross sectional area160.7 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
70TFA
159.2DAGS
2SAP
25.6TF
159.2SAP
2DAGS
94.3TF
37.3TF
114.7TFA
0AMH22 0615
160.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK
160.7MGOCOCKROACHES IN MANHOLE
0MWM
160.7AMH22 0615A
0MWL

Properties (6)

additional_info
SC359376
custom_field_two
2
customer
LACSD
datetime
2018-05-25T02:44:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false