Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 22, 2018, 06:42 AM
  • 22 0651_22 0650 _21052018_235815.mp4

Date
05/21/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16999
Time
11:42 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5605
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0651
Downstream MH
22 0650
Dir. of Survey
Downstream
Length Surveyed
319.2 ft.
Total Length
319.2 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
309
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
435
Pipe schematic from manhole 22 0651 to 22 0650
MH: 22 0651MH: 22 0650downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 06510 ft. MGO - General Observation - COCKROACHES IN MANHOLE2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start16.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start104.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"176.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"180.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"302.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"306.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"317 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish317 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish319.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0650319.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    16.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
319.2AMH22 0650
306.4TFC
0MWL
319.2MGOCOCKROACHES IN MANHOLE
0MWM
176.4TBA
317SAP
180.8TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
302.6TFC
0AMH22 0651
2SAP
104.3TFC
16.6SSS
2DAGS
317SSS
317DAGS
0MGOCOCKROACHES IN MANHOLE

Properties (6)

additional_info
SC359371
custom_field_two
2
customer
LACSD
datetime
2018-05-21T23:42:10-07:00
documentation
PRO PIPE
is_lateral_inspection
false