Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 15, 2017, 07:47 AM
  • 15 0066_15 0065 _02142017_234803.mp4

Date
02/14/2017
W/O
619008
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00624
PipeID
P11960
Time
11:47 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4242
Sewer Name
15 PUENTE RELIEF TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
WO_619008_TV15024_FEB2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0065
Downstream MH
15 0066
Dir. of Survey
Upstream
Length Surveyed
237 ft.
Total Length
237 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412H
O&M Rating
98
Overall Index
2
Overall Quick
Overall Rating
98
Pipe schematic from manhole 15 0065 to 15 0066
MH: 15 0065MH: 15 0066upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 00660.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish0.5 ft. MGO - General Observation - COCKROACHES IN MANHOLE235 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start237 ft. AMH - Downstream Manhole, Survey Begins - 15 0065237 ft. MWL - Water Level, 50 %of cross sectional area237 ft. MWM - Water Mark, 60 %of cross sectional area

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0AMH15 0065
236.5DAGS
2DAGS
236.5MGOCOCKROACHES IN MANHOLE
237AMH15 0066
0MWL
0MWM

Properties (6)

additional_info
SC306745
custom_field_two
4
customer
LACSD
datetime
2017-02-14T23:47:25-08:00
documentation
PRO PIPE
is_lateral_inspection
false