Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2018, 09:40 AM
  • H 0560_H 0559 _01062018_025755.mp4

Date
06/01/2018
W/O
701217
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00186
PipeID
P10984
Time
2:40 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5682
Sewer Name
H JOINT OUTFALL H - UNIT 8C
City
BALDWIN PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_701217_TV15170_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0560
Downstream MH
H 0559
Dir. of Survey
Downstream
Length Surveyed
279.6 ft.
Total Length
279.6 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
278
O&M Index
2
O&M Quick
4132
O&M Rating
12
Overall Index
3
Overall Quick
Overall Rating
290
Pipe schematic from manhole H 0560 to H 0559
MH: H 0560MH: H 0559downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 05600 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish58.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"58.9 ft. RFC - Roots Fine Connection, from 02 to 04 o'clock82.3 ft. RML - Roots Medium Lateral, at 10 o'clock, 30 %, within 8 inches of joint: NO82.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"154.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.9 ft. SRP - Surface Reinforcement Projecting, from 01 to 04 o'clock, within 8 inches of joint: NO162.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"169 ft. RFC - Roots Fine Connection, from 08 to 10 o'clock169 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"169 ft. RBL - Roots Ball Lateral, at 10 o'clock, 75 %178.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"194.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"202.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"218.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.7 ft. RMC - Roots Medium Connection, from 02 to 04 o'clock, 10 %, within 8 inches of joint: NO226.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"234.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"242.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"279.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish279.6 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK279.6 ft. AMH - Downstream Manhole, Survey Ends - H 0559279.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    26.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Projecting, from 01 to 04 o'clock, within 8 inches of joint: NO

    157.9 ft. - Surface Reinforcement Projecting, from 01 to 04 o'clock, within 8 inches of joint: NO

  • Roots Fine Connection, from 08 to 10 o'clock

    169 ft. - Roots Fine Connection, from 08 to 10 o'clock

Observations (33)

DistanceCodeObservation
26.1SAP
0AMHH 0560
242.9TF
82.3RML
226.7RMC
0MWL
82.3TF
58.9TF
178.2TF
162.5TFC
210.7TFC
0MGOCONNECTION AT MH 3 O'CLOCK
194.4TFC
279.6SAP
169RFC
234.5TFC
58.9RFC
218.3TFC
169TF
0MGOCONNECTION AT MH 9 O'CLOCK
154.2TFC
279.6MGOCONNECTION AT MH 9 O'CLOCK
202.4TFC
279.6AMHH 0559
169RBL
5SAV
0MWM
157.9SRP
226.7TF
5SSS
122.7TF
26.1SAV
279.6SSS

Properties (6)

additional_info
SC359340
custom_field_two
2
customer
LACSD
datetime
2018-06-01T02:40:13-07:00
documentation
PROPIPE
is_lateral_inspection
false