Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 22, 2019, 10:21 AM
  • Section#3_16 0275_16 0274__7222019__I0185R.mp4

Date
07/22/2019
W/O
0777342
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00652
PipeID
P13317
Time
3:21 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0185R
Sewer Name
16 CHAPEL AVENUE TRUNK, SECTION 1
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Maintenance Related
Project
20190722MDM_CHAPEL_AVENUE_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
16 0275
Downstream MH
16 0274
Dir. of Survey
Downstream
Length Surveyed
218.3 ft.
Total Length
218.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 16 0275 to 16 0274
MH: 16 0275MH: 16 0274downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:30AM73.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB85.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - STUB97.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN112.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - STUB123.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN124.9 ft. MGO - General Observation - 18" VCP135.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - STUB147.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB162.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN173.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - STUB188.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - STUB200.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN218.3 ft. AMH - Downstream Manhole, Survey Ends - 3:45AM

Observation photos (1)

  • General Observation - 18" VCP

    124.9 ft. - General Observation - 18" VCP

Observations (16)

DistanceCodeObservation
97.1TFOPEN
73.4TFCSTUB
124.9MGO18" VCP
0MWM
173.4TFCSTUB
0MWL
162.4TFOPEN
147.1TFCSTUB
200.2TFOPEN
0AMH3:30AM
218.3AMH3:45AM
123.8TFOPEN
135.5TFCSTUB
188.4TFCSTUB
85.5TFCSTUB
112.2TFCSTUB

Properties (5)

additional_info
ROOT EVALUATION ONLY
customer
LACSD
datetime
2019-07-22T03:21:57-07:00
documentation
MARTIN,REVELES,OLIVER 111,SHADLER
is_lateral_inspection
false