Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 19, 2019, 11:23 AM
  • Section#3_18 0942_18 0941__7192019__I0181R.mp4

Date
07/19/2019
W/O
0777341
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00701
PipeID
P14789
Time
4:23 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0181R
Sewer Name
18 SCOTT AVENUE RELIEF TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Maintenance Related
Project
20190719MDM_SCOTT_AVENUE_RELIEF_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
7.519999980926514 in.
Upstream MH
18 0942
Downstream MH
18 0941
Dir. of Survey
Downstream
Length Surveyed
178 ft.
Total Length
178 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
1
Overall Quick
Overall Rating
1
Pipe schematic from manhole 18 0942 to 18 0941
MH: 18 0942MH: 18 0941downstream0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:25AM39.8 ft. MGO - General Observation - 7.5" VCP =PVCP88.1 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN88.1 ft. RFL - Roots Fine Lateral, from 12 to 06 o'clock - 2%177.1 ft. MGO - General Observation - MH CONN 12:00 ACTIVE177.1 ft. MGO - General Observation - BOLT AT MH # 941-LOCK CHANGED ON GATE178 ft. AMH - Downstream Manhole, Survey Ends - 4:45AM

Observation photos (3)

  • General Observation - 7.5" VCP =PVCP

    39.8 ft. - General Observation - 7.5" VCP =PVCP

  • Roots Fine Lateral, from 12 to 06 o'clock - 2%

    88.1 ft. - Roots Fine Lateral, from 12 to 06 o'clock - 2%

  • General Observation - BOLT AT MH # 941-LOCK CHANGED ON GATE

    177.1 ft. - General Observation - BOLT AT MH # 941-LOCK CHANGED ON GATE

Observations (10)

DistanceCodeObservation
0MGOMH CONN 9:00 ACTIVE
177.1MGOMH CONN 12:00 ACTIVE
0MWM
88.1TBOPEN
177.1MGOBOLT AT MH # 941-LOCK CHANGED ON GATE
0MWL
39.8MGO7.5" VCP =PVCP
88.1RFL2%
0AMH4:25AM
178AMH4:45AM

Properties (6)

additional_info
POST ROOT EVALUATION ONLY
customer
LACSD
datetime
2019-07-19T04:23:11-07:00
documentation
MARTIN,REVELES,OLIVER 111,SHADLER
is_lateral_inspection
false
lining
PVCP