Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 19, 2019, 03:51 PM
  • A 0302A_A 0302_7192019_114016.mp4

Date
07/19/2019
W/O
0767441
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00325
PipeID
P08213
Time
8:51 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8033
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
WHITTIER
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
20190719DF_JOA_1A_SAN_JOSE_CREEK_WRP_INT
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Upstream MH
A 0302
Downstream MH
A 0302A
Dir. of Survey
Upstream
Length Surveyed
34.7 ft.
Total Length
34.7 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole A 0302 to A 0302A
MH: A 0302MH: A 0302Aupstream0 ft. AMH - Upstream Manhole, Survey Ends - 11:52 AM0 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach0 ft. MGO - General Observation - Grease Throughout The Reach (5%)1.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.7 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG1.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish4.6 ft. MGP - General Photograph6.2 ft. MGP - General Photograph26.7 ft. MGP - General Photograph32.7 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG32.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start34.6 ft. MWL - Water Level, 25 %of cross sectional area34.6 ft. MWM - Water Mark, 30 %of cross sectional area34.7 ft. AMH - Downstream Manhole, Survey Begins - 11:39 AM

Observation photos (7)

  • Water Level, 25 %of cross sectional area

    0.1 ft. - Water Level, 25 %of cross sectional area

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    8 ft. - General Photograph

  • General Photograph

    28.5 ft. - General Photograph

Observations (17)

DistanceCodeObservation
2SZ70% MAG
30.1MGP
8MGP
28.5MGP
0AMH11:39 AM
0.1MWL
33SSS
34.7AMH11:52 AM
34.7MGOPeeling & Flaking Throughout The Reach
2SAV
33SAV
0.1MWM
33SZ70% MAG
2SAV
2SSS
34.7MGOGrease Throughout The Reach (5%)
33SAV

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-07-19T08:51:42-07:00
documentation
FRANKLIN, CASTILLO, IGNACIO, RUVALCABA
is_lateral_inspection
false