Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 12, 2019, 03:54 PM
  • B 1099_B 1516_7122019_091623.mp4

Date
07/12/2019
W/O
0776807
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z01130
PipeID
P25643
Time
8:54 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8025
Sewer Name
B JOINT OUTFALL B - UNIT 6G CONNECTION
City
ALHAMBRA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
23
Purpose
Routine Assessment
Project
20190712SHO_JOINT_OUTFALL_B_UNIT_6G_CONNECTION
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 1516
Downstream MH
B 1099
Dir. of Survey
Upstream
Length Surveyed
93.2 ft.
Total Length
93.2 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
18
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
4
Overall Quick
Overall Rating
21
Pipe schematic from manhole B 1516 to B 1099
MH: B 1516MH: B 1099upstream0 ft. AMH - Upstream Manhole, Survey Ends - B 15164.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"7.5 ft. OBS - Obstacles Built Into Structure, 20 %of cross sectional area, from 07 to 08 o'clock - CONCRETE PIPE9.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish22.5 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish45 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES60.8 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start72.7 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start81.2 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish88.2 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start88.2 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO93.2 ft. MWM - Water Mark, 20 %of cross sectional area93.2 ft. MWL - Water Level, 5 %of cross sectional area93.2 ft. AMH - Downstream Manhole, Survey Begins - B 1099

Observation photos (6)

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    5 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO

    5 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    20.5 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    32.4 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES

    48.2 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES

  • Obstacles Built Into Structure, 20 %of cross sectional area, from 07 to 08 o'clock - CONCRETE PIPE

    85.7 ft. - Obstacles Built Into Structure, 20 %of cross sectional area, from 07 to 08 o'clock - CONCRETE PIPE

Observations (14)

DistanceCodeObservation
12SAV
5SAV
20.5SSS
70.7SAV
0MWM
93.2AMHB 1516
32.4SAV
0MWL
89.1TFA
0AMHB 1099
84SSS
48.2SRV
5SRV
85.7OBSCONCRETE PIPE

Properties (6)

custom_field_two
2
customer
LACSD
datetime
2019-07-12T08:54:04-07:00
documentation
OBREGON, CASTILLO, BRAR, IGNACIO
is_lateral_inspection
false
year_laid
19860324