Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2019, 08:21 AM
  • 11_1_1_11062019_013344.mp4

Date
06/11/2019
W/O
766606
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13910
Time
1:21 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6563
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_766606_TV18177_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0091
Downstream MH
18 0090
Dir. of Survey
Downstream
Length Surveyed
353.4 ft.
Total Length
353.4 ft.
Structural Index
3
Structural Quick
3M2B
Structural Rating
238
O&M Index
2
O&M Quick
2M00
O&M Rating
142
Overall Index
2
Overall Quick
Overall Rating
380
Pipe schematic from manhole 18 0091 to 18 0090
MH: 18 0091MH: 18 0090downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00910 ft. MWM - Water Mark, 40 %of cross sectional area2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start24.5 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES41.3 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Start49.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"56.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"84.1 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1"107.6 ft. SSS - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish254.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"351.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish353.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0090

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    24.5 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    41.3 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

    84.1 ft. - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

Observations (15)

DistanceCodeObservation
351.7SAP
2.9SAP
0MWL
2.9DAGS
84.1TBI
254.8TFC
24.5CL
353.4AMH18 0090
107.6SSS
49.8TFC
0AMH18 0091
351.7DAGS
56.3TFC
41.3SSS
0MWM

Properties (6)

additional_info
SC377686
custom_field_two
3
customer
LACSD
datetime
2019-06-11T01:21:39-07:00
documentation
PROPIPE
is_lateral_inspection
false