Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 12, 2019, 07:39 AM
  • 1_1_1_12062019_005722.mp4

Date
06/12/2019
W/O
766537
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00714
PipeID
P14186
Time
12:39 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6602-SC377528
Sewer Name
18 WASHINGTON BOULEVARD TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
09
Purpose
Routine Assessment
Project
WO_766537_TV18179_MAY2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0352
Downstream MH
18 0228
Dir. of Survey
Downstream
Length Surveyed
150.8 ft.
Total Length
150.8 ft.
Structural Index
3
Structural Quick
4234
Structural Rating
26
O&M Index
2
O&M Quick
4122
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
35
Pipe schematic from manhole 18 0352 to 18 0228
MH: 18 0352MH: 18 0228downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK ACTIVE0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED0 ft. MWM - Water Mark, 65 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 18 03521.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start1.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start13.4 ft. FS - Fracture Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES34.1 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES38.8 ft. FM - Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES53.9 ft. CS - Crack Spiral, from 07 to 08 o'clock, within 8 inches of joint: YES54.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"77 ft. CS - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES91.8 ft. FS - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES101.8 ft. CM - Crack Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES102.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"104.5 ft. FS - Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES144.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES149.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish149.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish150.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0228

Observation photos (11)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    1.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    1.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

    13.4 ft. - Fracture Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    34.1 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

    38.8 ft. - Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 07 to 08 o'clock, within 8 inches of joint: YES

    53.9 ft. - Crack Spiral, from 07 to 08 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    77 ft. - Crack Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    91.8 ft. - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES

    101.8 ft. - Crack Multiple, from 09 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

    104.5 ft. - Fracture Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    144.9 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
0MGOCONNECTION AT MH 3 O'CLOCK ACTIVE
149.6DAE
54.3TFC
0MGOCONNECTION AT MH 9 O'CLOCK CAPPED
149.6DAGS
38.8FM
91.8FS
101.8CM
0MWM
0MWL
13.4FS
34.1CL
77CS
53.9CS
1.2DAGS
0VC
104.5FS
144.9FM
150.8AMH18 0228
0AMH18 0352
102.5TFC
1.2DAE

Properties (6)

additional_info
SC377528
custom_field_two
3
customer
LACSD
datetime
2019-06-12T00:39:27-07:00
documentation
PRO PIPE
is_lateral_inspection
false