Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2019, 06:13 AM
  • 9_1_1_05062019_232026.mp4

Date
06/05/2019
W/O
766504
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18507
Time
11:13 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6552
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
07
Purpose
Routine Assessment
Project
WO_766504_TV14019_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0423
Downstream MH
14 0422
Dir. of Survey
Downstream
Length Surveyed
150.1 ft.
Total Length
150.1 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
2
O&M Quick
412E
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
207
Pipe schematic from manhole 14 0423 to 14 0422
MH: 14 0423MH: 14 0422downstream0 ft. MWM - Water Mark, 70 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04230 ft. MWL - Water Level, 60 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start3.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"27.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"52.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"76.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"100.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"129 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish148.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish148.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish150.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0422

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
76.5TFC
2SSS
0MWM
0AMH14 0423
3.2TFC
150.1AMH14 0422
52.4TFC
100.6TFC
148.7SSS
148.7DAGS
148.7SAP
0MWL
2SAP
2DAGS
27.6TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
129TFC

Properties (6)

additional_info
SC378167
custom_field_two
2
customer
LACSD
datetime
2019-06-05T23:13:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false