Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2019, 05:33 AM
Date
06/05/2019
W/O
766504
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18503
Time
10:33 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6552
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
07
Purpose
Routine Assessment
Project
WO_766504_TV14019_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0419A
Downstream MH
14 0419
Dir. of Survey
Downstream
Length Surveyed
220.7 ft.
Total Length
220.7 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
223
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
223
Pipe schematic from manhole 14 0419A to 14 0419
MH: 14 0419AMH: 14 0419downstream0 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - 80 ft. AMH - Upstream Manhole, Survey Begins - .2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MWM - Water Mark, 40 %of cross sectional area - .2 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start12.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"40.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"64.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"89.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"113 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"141.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"165.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"189.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"213.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"220 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish220 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish220.7 ft. AMH - Downstream Manhole, Survey Ends - .220.7 ft. MGO - General Observation - Connection at 3'0 in MH

Observations (19)

DistanceCodeObservation
2SAP
113TFC
213.8TFC
220.7AMH.
220SAP
12.2TFC
2MWM.
40.6TFC
189.8TFC
141.5TFC
165.3TFC
220SSS
64.8TFC
0TFC8
89.2TFC
2MWLS
0AMH.
220.7MGOConnection at 3'0 in MH
2SSS

Properties (6)

additional_info
SC378167 Observations are a continuation of the Insp. Report for reaches 14 0420 to 14 0419A
custom_field_two
5
customer
LACSD
datetime
2019-06-05T22:33:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false