Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2019, 07:02 AM
  • 24_1_1_06062019_002927.mp4

Date
06/06/2019
W/O
766504
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P20822
Time
12:02 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6552
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
07
Purpose
Routine Assessment
Project
WO_766504_TV14019_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0420
Downstream MH
14 0419A
Dir. of Survey
Downstream
Length Surveyed
326.9 ft.
Total Length
326.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 14 0420 to 14 0419A
MH: 14 0420MH: 14 0419Adownstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04202 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start44.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"68.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.5 ft. MGO - General Observation - RUN LIST STATES MH AT 104'.104.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish104.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish104.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0419, MH 14 0419A DOES NOT EXIST.116.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"144.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"168.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"217.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"245.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"269.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"293.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"317.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"326.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Downstream Manhole, Survey Ends - 14 0419, MH 14 0419A DOES NOT EXIST.

    104.9 ft. - Downstream Manhole, Survey Ends - 14 0419, MH 14 0419A DOES NOT EXIST.

Observations (22)

DistanceCodeObservation
293.9TFC
68.1TFC
0MWL
104.5MGORUN LIST STATES MH AT 104'.
116.6TFC
104.8SAP
44.6TFC
217.2TFC
0MWM
144.7TFC
104.9AMH14 0419, MH 14 0419A DOES NOT EXIST.
2SSS
168.9TFC
2SAP
269.4TFC
245.6TFC
193.3TFC
92.2TFC
326.9MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH14 0420
317.9TFC
104.8SSS

Properties (6)

additional_info
SC378167 14 0420 to 14 0419A survey ends at 104.18. Survey continued on Insp. Report 14 0419A to 14 0419 from 104.48 ft. Edited by LACSD operator.
custom_field_two
2
customer
LACSD
datetime
2019-06-06T00:02:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false