Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2019, 05:19 AM
  • 2_1_1_15052019_231305.mp4

Date
05/15/2019
W/O
761347
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00627
PipeID
P12153
Time
10:19 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6550
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Project
WO_761347_TV15207_APR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
15 0232
Downstream MH
15 0230
Dir. of Survey
Downstream
Length Surveyed
653.9 ft.
Total Length
653.9 ft.
Structural Index
3
Structural Quick
3Y00
Structural Rating
390
O&M Index
2
O&M Quick
3B2Y
O&M Rating
300
Overall Index
3
Overall Quick
Overall Rating
690
Pipe schematic from manhole 15 0232 to 15 0230
MH: 15 0232MH: 15 0230downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 02320 ft. MWL - Water Level, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start168.2 ft. LL - Alignment Left, 10 %588 ft. OBZ - Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock, Start - UNKNOWN DEBRIS IN LINE653 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish653.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish653.8 ft. OBZ - Obstacles Other, 15 %of cross sectional area, from 05 to 07 o'clock, Finish653.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0230

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Left, 10 %

    168.2 ft. - Alignment Left, 10 %

Observations (11)

DistanceCodeObservation
168.2LL
6SAP
653.8SAP
0MWM
653DAGS
2DAGS
588OBZUNKNOWN DEBRIS IN LINE
653.9AMH15 0230
0AMH15 0232
0MWL
653.8OBZ

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-15T22:19:44-07:00
documentation
PROPIPE
is_lateral_inspection
false