Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 16, 2019, 06:14 AM
  • 1_1_1_15052019_231720.mp4

Date
05/15/2019
W/O
761347
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00627
PipeID
P12152
Time
11:14 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6550
Sewer Name
15 SAN JOSE CREEK TRUNK
City
INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
02
Purpose
Routine Assessment
Project
WO_761347_TV15207_APR2019
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
15 0230
Downstream MH
15 0229
Dir. of Survey
Downstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
5121
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 15 0230 to 15 0229
MH: 15 0230MH: 15 0229downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 02300 ft. MWL - Water Level, 100 %of cross sectional area0 ft. MWM - Water Mark, 100 %of cross sectional area2 ft. MGO - General Observation - VIEW OF THE DOWNLEG PIPE FROM THE U/S SIDE OF THE2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

Observation photos (2)

  • Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (6)

DistanceCodeObservation
2MGOVIEW OF THE DOWNLEG PIPE FROM THE U/S SIDE OF THE
2DAGS
0AMH15 0230
2SAP
0MWL
0MWM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-05-15T23:14:02-07:00
documentation
PROPIPE
is_lateral_inspection
false