Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 19, 2019, 08:25 AM
  • 8_1_1_19042019_014100.mp4

Date
04/19/2019
W/O
761615
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00689
PipeID
P13861
Time
1:25 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6521
Sewer Name
18 MILLS AVENUE TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_761615_TV18176_APR2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0045
Downstream MH
18 0046
Dir. of Survey
Upstream
Length Surveyed
301.2 ft.
Total Length
301.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 18 0045 to 18 0046
MH: 18 0045MH: 18 0046upstream0 ft. AMH - Upstream Manhole, Survey Ends - 18 00460 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O' CLOCK AT MH1.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish44.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"98.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"104.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"164.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"169.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"219.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"221.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"241.8 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES268 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"273.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"295.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start301.2 ft. AMH - Downstream Manhole, Survey Begins - 18 0045301.2 ft. MWL - Water Level, 15 %of cross sectional area301.2 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    59.4 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
59.4CL
300.1SAP
131.5TFC
79.6TFC
137.1TFC
33.2TFC
0AMH18 0045
0MWL
27.4TFC
82.1TFC
301.2AMH18 0046
202.3TFC
196.3TFC
0MWM
6SAP
301.2MGOCAPPED CONNECTION AT 9 O' CLOCK AT MH
256.3TFC

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-04-19T01:25:14-07:00
documentation
PROPIPE
is_lateral_inspection
false