Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 15, 2016, 10:06 AM
  • A 0329_A 0328 _15062016_030721.mp4

Date
06/15/2016
W/O
574385
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00325
PipeID
P08239
Time
3:06 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3532
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
22
Purpose
Routine Assessment
Project
WO_574385_TV15129_JUNE2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
60 in.
Upstream MH
A 0329
Downstream MH
A 0328
Dir. of Survey
Downstream
Length Surveyed
660.1 ft.
Total Length
660.1 ft.
Structural Index
3
Structural Quick
3s00
Structural Rating
786
O&M Index
2
O&M Quick
412Y
O&M Rating
266
Overall Index
3
Overall Quick
Overall Rating
1052
Pipe schematic from manhole A 0329 to A 0328
MH: A 0329MH: A 0328downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 03290 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING 50%658.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish658.2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish658.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish660.1 ft. AMH - Downstream Manhole, Survey Ends - A 0328

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING 50%

    2 ft. - General Observation - MAG COATING 50%

Observations (11)

DistanceCodeObservation
660.1AMHA 0328
658.2SAP
0MWL
0AMHA 0329
2SAP
658.2SAV
658.2DAGS
0MWM
2DAGS
2SAV
2MGOMAG COATING 50%

Properties (7)

additional_info
SC305765
custom_field_two
2
customer
LACSD
datetime
2016-06-15T03:06:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
29314