Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 13, 2017, 05:34 AM
  • 05 0390_05 0389 _12072017_235243.mp4

Date
07/12/2017
W/O
640682
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00432
PipeID
P05602
Time
10:34 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3987-SC345551
Sewer Name
05 DISTRICT #5 MAIN RELIEF TRUNK
City
INGLEWOOD CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
WO_640682_TV05179_JUN2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
05 0390
Downstream MH
05 0389
Dir. of Survey
Downstream
Length Surveyed
386.2 ft.
Total Length
386.2 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
225
O&M Index
2
O&M Quick
412N
O&M Rating
154
Overall Index
3
Overall Quick
Overall Rating
379
Pipe schematic from manhole 05 0390 to 05 0389
MH: 05 0390MH: 05 0389downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 03900 ft. MWM - Water Mark, 50 %of cross sectional area7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start382.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish382.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish386.2 ft. AMH - Downstream Manhole, Survey Ends - 05 0389

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
382.1SAP
7DAGS
0MWL
0AMH05 0390
386.2AMH05 0389
382.1DAGS
7SAP
0MWM

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2017-07-12T22:34:17-07:00
is_lateral_inspection
false