Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 23, 2015, 11:56 AM
  • 14 0420_14 0419A_23122015_035654.mp4

  • 14 0420_14 0419A_23122015_041316.mp4

Date
12/23/2015
W/O
541758
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P20822
Time
3:56 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3057
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_541758_TV14019_DEC2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
14 0420
Downstream MH
14 0419
Dir. of Survey
Downstream
Length Surveyed
330.3 ft.
Total Length
330.3 ft.
Structural Index
3
Structural Quick
3L2I
Structural Rating
299
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
429
Pipe schematic from manhole 14 0420 to 14 0419
MH: 14 0420MH: 14 0419downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04200 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start19.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"44.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"68.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start68.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"93.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"117.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"145.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"195.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"201.6 ft. MGO - General Observation - RUN LIST STATES MH AT 104'.220.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"248.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"272.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"297.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"321.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"328 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish328 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish328 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0419, NO STRUCTURE, 14 0419A, FOUND AT 104'..330.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    68.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Downstream Manhole, Survey Ends - 14 0419, NO STRUCTURE, 14 0419A, FOUND AT 104'..

    330.3 ft. - Downstream Manhole, Survey Ends - 14 0419, NO STRUCTURE, 14 0419A, FOUND AT 104'..

Observations (25)

DistanceCodeObservation
201.6MGORUN LIST STATES MH AT 104'.
321.4TFC
0MWM
0AMH14 0420
330.3AMH14 0419, NO STRUCTURE, 14 0419A, FOUND AT 104'..
68.7SSS
220.2TFC
44.4TFC
2.4SAP
2DAGS
93.1TFC
328SSS
0MWL
117.8TFC
328DAGS
297.1TFC
272.4TFC
330.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK
68.7TFC
170.8TFC
19.8TFC
195.7TFC
328SAP
248.2TFC
145.9TFC

Properties (6)

additional_info
SC204196
custom_field_two
2
customer
LACSD
datetime
2015-12-23T03:56:36-08:00
documentation
PRO PIPE
is_lateral_inspection
false