Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 23, 2015, 11:47 AM
  • 14 0420A_14 0420_23122015_034800.mp4

Date
12/23/2015
W/O
541758
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18504
Time
3:47 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3057
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_541758_TV14019_DEC2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
14 0420A
Downstream MH
14 0420
Dir. of Survey
Downstream
Length Surveyed
154.9 ft.
Total Length
154.9 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
150
O&M Index
2
O&M Quick
412E
O&M Rating
64
Overall Index
2
Overall Quick
Overall Rating
214
Pipe schematic from manhole 14 0420A to 14 0420
MH: 14 0420AMH: 14 0420downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 0420A0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start23.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"44.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"73 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"97.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"125.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"153.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish153.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish153.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish154.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0420

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0AMH14 0420A
44.5TFC
73TFC
153.3SSS
125.8TFC
2DAGS
0MWL
153.3DAGS
2.5SSS
23.8TFC
2SAP
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
97.2TFC
0MWM
153.3SAP
154.9AMH14 0420

Properties (6)

additional_info
SC204196
custom_field_two
3
customer
LACSD
datetime
2015-12-23T03:47:44-08:00
documentation
PRO PIPE
is_lateral_inspection
false