Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 23, 2015, 11:38 AM
  • 14 0421_14 0420A_23122015_033846.mp4

Date
12/23/2015
W/O
541758
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18505
Time
3:38 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3057
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_541758_TV14019_DEC2015
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
14 0421
Downstream MH
14 0420A
Dir. of Survey
Downstream
Length Surveyed
187.2 ft.
Total Length
187.2 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
185
O&M Index
2
O&M Quick
412F
O&M Rating
78
Overall Index
2
Overall Quick
Overall Rating
263
Pipe schematic from manhole 14 0421 to 14 0420A
MH: 14 0421MH: 14 0420Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04210 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"60.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"84.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"185.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish185.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish185.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish187.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK187.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0420A

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
133.5TFC
109.1TFC
187.2AMH14 0420A
11.4TFC
0AMH14 0421
185.2SAP
60.5TFC
185.2SSS
2SAP
35.8TFC
0MWM
2DAGS
0MWL
187.1MGOACTIVE CONNECTION AT MH 9 O'CLOCK
185.2DAGS
162.3TFC
2.3SSS
84.7TFC

Properties (6)

additional_info
SC204196
custom_field_two
2
customer
LACSD
datetime
2015-12-23T03:38:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false