Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 29, 2016, 11:46 PM
  • H 0671_H 0670_20160712_041317.mp4

Date
06/29/2016
W/O
574527
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00941
PipeID
P11078
Time
4:46 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3611
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
WO_574527_TV18074_JULY2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0670
Downstream MH
H 0671
Dir. of Survey
Upstream
Length Surveyed
420.7 ft.
Total Length
420.7 ft.
Structural Index
2
Structural Quick
2P00
Structural Rating
168
O&M Index
2
O&M Quick
2P00
O&M Rating
168
Overall Index
2
Overall Quick
Overall Rating
336
Pipe schematic from manhole H 0670 to H 0671
MH: H 0670MH: H 0671upstream0 ft. AMH - Upstream Manhole, Survey Ends - H 06711.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish420.7 ft. MGO - General Observation - MAG COATING 80%420.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start420.7 ft. MWM - Water Mark, 25 %of cross sectional area420.7 ft. MWL - Water Level, 20 %of cross sectional area420.7 ft. AMH - Downstream Manhole, Survey Begins - H 0670420.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MGOMAG COATING 80%
419SSS
0DAGS
420.7AMHH 0671
0MWM
0MWL
0AMHH 0670
419DAGS
0SSS

Properties (6)

additional_info
SC305790
custom_field_two
3
customer
LACSD
datetime
2016-06-29T16:46:41-07:00
documentation
PROPIPE
is_lateral_inspection
false