Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 21, 2016, 12:03 PM
  • 18 0423_18 0422_20160321_051347.mp4

Date
03/21/2016
W/O
557858
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00699
PipeID
P14258
Time
5:03 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3229
Sewer Name
18 SANTA FE STREET RELIEF TRUNK
City
WHITTIER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_557858_TV18044_2016MAR
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Upstream MH
18 0423
Downstream MH
18 0422
Dir. of Survey
Downstream
Length Surveyed
194.5 ft.
Total Length
194.5 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 18 0423 to 18 0422
MH: 18 0423MH: 18 0422downstream0 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 18 04230 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK2 ft. MGO - General Observation - MAGNEZIUM H.O. START7.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start165.5 ft. CS - Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES193.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish194.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0422

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    7.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES

    165.5 ft. - Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES

Observations (10)

DistanceCodeObservation
0MGOLATERAL AT MH 3 OCLOCK
0AMH18 0423
7.2DAGS
2MGOMAGNEZIUM H.O. START
0MWM
193.3DAGS
0MWL
165.5CS
0MGOLATERAL AT MH 9 OCLOCK
194.5AMH18 0422