Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 16, 2016, 06:03 AM
  • B 0327_B 0326_15032016_230348.mp4

Date
03/15/2016
W/O
557611
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00090
PipeID
P08852
Time
11:03 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3293
Sewer Name
B JOINT OUTFALL B - UNIT 4B
City
ROSEMEAD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Routine Assessment
Project
WO_557611_TV15046_2016MAR
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 0327
Downstream MH
B 0326
Dir. of Survey
Downstream
Length Surveyed
385.8 ft.
Total Length
385.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
352N
O&M Rating
167
Overall Index
2
Overall Quick
Overall Rating
167
Pipe schematic from manhole B 0327 to B 0326
MH: B 0327MH: B 0326downstream0 ft. AMH - Upstream Manhole, Survey Begins - B 03270 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3.1 ft. MGO - General Observation - MAG COATING 90%245.3 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start257.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish370.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start384 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish384 ft. MGO - General Observation - COCKROACHES IN MANHOLE384 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK384 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish385.8 ft. AMH - Downstream Manhole, Survey Ends - B 0326

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    245.3 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    370.1 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    384 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (13)

DistanceCodeObservation
384DSZ
370.1DSZ
384MGOCOCKROACHES IN MANHOLE
0AMHB 0327
245.3DSZ
3.1MGOMAG COATING 90%
384MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MGOCOCKROACHES IN MANHOLE
257.7DSZ
2DAGS
0MWL
384DAGS
385.8AMHB 0326

Properties (6)

additional_info
SC305417
custom_field_two
4
customer
LACSD
datetime
2016-03-15T23:03:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false