Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2016, 10:13 AM
  • 08 0564_08 0563_08032016_022125.mp4

Date
03/08/2016
W/O
557595
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00015
PipeID
P00149
Time
2:13 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3279
Sewer Name
08 MAIN STREET RELIEF TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
WO_557595_TV08024_2016MAR
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
08 0564
Downstream MH
08 0563
Dir. of Survey
Downstream
Length Surveyed
299.9 ft.
Total Length
299.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
118
Pipe schematic from manhole 08 0564 to 08 0563
MH: 08 0564MH: 08 0563downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 05640 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MGO - General Observation - MAG COATING 60%2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start297.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish299.9 ft. AMH - Downstream Manhole, Survey Ends - 08 0563

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0AMH08 0564
0MWL
2MGOMAG COATING 60%
299.9AMH08 0563
297.4DAGS
0MWM
2DAGS

Properties (7)

additional_info
SC305403
custom_field_two
4
customer
LACSD
datetime
2016-03-08T02:13:13-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
19740709